Project Transformation ◀ drag to compare ▶
Before After
Project Type
Wall Tile
Material
Large Format Marble Look Porcelain Tile
Location
Orange County, CA
Timeline
1.5 Weeks
Our Wall Tile Installation Process
01
Surface Prep

We demo existing material, inspect for moisture and damage, and apply the correct backer system, cement board, RedGard, or similar, before any tile work begins.

02
Layout & Design

We snap reference lines, confirm the pattern, and dry-set key sections before committing to mortar. No surprises at the end of the job.

03
Set & Grout

Tile is adhered with the correct thin-set, back-buttered where required, and set with consistent joint spacing throughout using spacers or wedges.

04
Finish & Clean

Grout is applied, haze removed, and the completed wall surface inspected under light at multiple angles. Sealed, clean, and ready to use.

Transform your
walls.
Get a Free Quote